Scope of work:
The work involved post monsoon maintenance dredging of quantity 730,000 / 1,440,000 cu-m to dredge siltation and accumulation in the channel to maintain the designed depth of the turning circle and the channel of Hazira Port, Gujarat Adani Port Limited, Mundra on the West Coast of India. The dredged material was dumped offshore with haulage distance of 5 nm.
Material dredged
Sand, soft to medium Clay and silt
Contractor:
Gujarat Adani Port Limited, Mundra, India
Duration of the project:
12/09/2005 to 07/10/2005
21/07/2006 to 04/08/2006 & 12/12/2006 to 05/01/2007
Equipments deployed:
Trailer Suction Hopper Dredger “Pacifique”
Survey boat “Kingfisher”
|