Scope of work:
The capital scope involved dredging of the very shallow sand bar / shoal across the designed approach channel of Krishnapatnam Port to achieve the designed depth for creating navigable channel. The dredged material was dumped offshore with haulage distance of 3 nm.
Material dredged
Compacted sand, soft to medium Clay and silt
Contractor:
Krishnapatnam Port, India
Duration of the project:
07/02/2008 to 01/03/2008
Equipments deployed:
Trailer Suction Hopper Dredger “Orwell”
|