Installation of navigational aids, Gangavaram Port, East Coast of India, India
Development of Gangavaram Port Limited to be the deep water port available on the east coast of India, the challenging job was awarded to ISD. The work includes installation and marking of the channel with navigable buoys and leading marks, lights for safe navigation and marking of the channel limits.
|
|
| |
Read more ... |
|
|
|
 |
Development of deepwater port, Dhamra Port Company Limited, Dhamra, India
The development of Dhamra port on the east coast of India, Orissa State, close to Paradip, includes dredging of the new port of 19 kms long access channel, turning berths and berthing areas as well reclamation and consolidation of the berth area and for infrastructure building.
|
|
| |
Read more ... |
|
|
|
 |
Supply of Manpower for maintenance of geo bunds, Hazira Port, Hazira, India.
The scope of work includes civil engineering and regular maintenance geo bags of 9,500 No’s mega bags (6 cu-m / piece) to form a 9 m high seawall at Hazira Port, Hazira on the West Coast of India first of its kind of work in the Indian Coast. Maintenance includes |
 |
| |
Read more ... |
|
|
|
 |
Charter of dredger to Dredging Corporation of India – Capital dredging of Sethusamudram at Palks Bay.
Development of Sethusamudram Channel, project that will bring pride to India as well make a land mark in the Indian maritime history of creating a channel for 167 kms stretch between India and Sri Lanka.
|
 |
| |
Read more ... |
|
|
| |
 |
Development of deepwater port, Gangavaram Port, East Coast of India, India.
Development of GPL to be the deepest port available on the east coast of India, the challenging job is being undertaken by ISD. The project is being executed in different packages, and presently ISD is in the fag end of completion of the project to provide navigable and designed depth in the approach channel,
|
 |
| |
Read more ... |
|
|
| |
 |
Maintenance dredging at Kakinada Seaport Limited, Kakinada, India.
The maintenance work involved dredging the approach channel, turning basin and alongside berth face. The quantity of 2.2 Mio cu-m is to dredge siltation and accumulation in the channel to maintain the designed depth for navigational purpose of Kakainada Seaport Limited, Kakinada on thee east coast of India.
|
 |
| |
Read more ... |
|
|
| |
| |
 |
| |
|
|
 |
|
|